MODERN TUNNEL SYSTEMS
PAVE THE WAY FOR THE FUTURE


OUR PROJECTS


Micro-tunneling

Micro-tunneling (Closed-face) technology allows us to construct an accurate subsurface installation of Steel, Reinforced Concrete Jacking, Hybrid Vitrified Clay and Poly-Crete Pipes.

READ MORE


Shaft Construction

Shafts are the doorways to the underground, serving as the location at which all material enters and exits.

READ MORE




Pipe-jacking Technique (PJ)

Pipe-jacking (Open-face) technology is a technique for installing men-entry size of pipes

READ MORE



Horizontal Directional Drilling

Horizontal directional drilling technology is a construction method used for the crossing of obstacles found along the pipeline route, such a road, rivers, etc.

READ MORE


News

December 29, 2021

    • Machine: AVN600_M-1414, M1415C • City: Riyadh • Project: External Sewage Project at the Medical Village in Riyadh city. • Main Contractor: Salat for Contracting Co. • Client Name: Medical Village. • Scope of Work: installation of DN500 mm RCJ Pipe lined with GRP with O.D860 mm in Riyadh city.

December 4, 2021

    Machine: AVN600_M-1414,M1415C City: Taif – Yanbu STCC team finished a project of Water pipeline Project in Taif, and the equipment is on its way to Yanbu to be apart of project of Sewerage System Network & Housing Connection in Yanbu city.

December 4, 2021

    Machine: AVN800_M-1884,M1885C City: Yanbu Project: Sewerage System Network & Housing Connection in Yanbu city. Main Contractor: Sayegh Group of Companies. Client Name: Ministry of Environment, Water and Agriculture Scope of Work: installation of DN 1000 mm RCJ Pipe, Lined with GRP Project overview, the construction of a sewage network had been entirely halted […]

December 4, 2021

    Machine: AVN 1000_M-1674M, M1675C City: Al Hasa Project: Construction of sewage lines in Al Hasa city. Client: Ministry of Environment, Water and Agriculture Main Contractor: Middle engineering contracting co. Scope of Work: installation of DN 1200 mm RCJ Pipe, then insertion of 800 mm GRP pipe inside casing. Very Soon, the tunneling machine […]

December 4, 2021

    Machine: AVN 1200_M-2063M, M2068C City: AlQassim Project: Construction of conveying lines and sewage networks in Buraidah city. Main Contractor: Ibn Omairah Client: Ministry of Environment, Water and Agriculture Scope of Work: installation of DN 1200 mm RCJ Pipe, Lined with GRP Days ago, the STCC team successfully launched the machine, the crossing length […]


Our Projects