Introduction
Scope of work : Installation of DN 2000 mm Concrete Jacking Pipes.
Project Facts:
- Project area was close to king palace gate and the close to the Red Sea and water at 1-meter depth. (Some shafts water pressure was around 1.5 bar)
- Supplied special ancillaries (Pipe Break) to stop backward moving of the pipes due to water pressure.
- Jeddah Municipality announced the great achieved through the social media (Jeddah Municipality twitter and snap chat)
Critical success factors:
- Special ancillary (Pipe Brake) was supplied to enhance processes, boost job productivity, and improve compatibility with working conditions.
- Provided a suitable team of well-experienced staff.
- Worked nonstop 24hours/7 days.
- End Client
- Jeddah Municipality
- Location
- Jeddah City
- Main Contractor
- Al-Rashid A Hak Saudi Co. Ltd