Introduction
Scope of work : Installation of DN O.D 200 mm HDPE Pipe in AL Khobar city
Project Facts:
- Longest Crossing with 227 Lm executed at 14 M Depth.
- 14 pipes installed underneath very critical SWCC pipelines.
Critical success factors:
- Provided a suitable team of well-experienced staff.
- Obtained prequalification from the SEC & SWCC, all required documents and credentials has been submitted as per required.
- End Client
- SEC
- Location
- Al Khobar City
- Main Contractor
- Dharan Development Industrial & Investment Co