- Machine: AVN 1000_M-1674M, M1675C
- City: Al Hasa
- Project: Construction of sewage lines in Al Hasa city.
- Client: Ministry of Environment, Water and Agriculture
- Main Contractor: Middle engineering contracting co.
- Scope of Work: installation of DN 1200 mm RCJ Pipe, then insertion of 800 mm GRP pipe inside casing.
Very Soon, the tunneling machine will be launched, crossing length is 220 meters.